top of page

Frequently Asked Questions | Interior & Civil Contractors Gujarat | Sisco Profiles

What areas does Sisco Profiles serve?

Sisco Profiles primarily serves Ahmedabad, Vadodara, Surat, Rajkot, and across Gujarat. For large-scope projects, we also take work across India — we have delivered projects in Odisha, Rajasthan, Maharashtra, and Karnataka.

What is your execution process?

1. Understanding the requirement
2. Suggesting the right product based on budget and utility
3. Cost and timeline estimation
4. Material delivery and work commencement
5. Finishing Checks
6. Site Handover

Why choose a single turnkey interior contractor over separate civil, MEP, and Interior vendors?

Sisco Profiles manages all trades civil masonry, electrical, HVAC ducting, furniture, false ceilings, glass partitions, —under a single unified contract. This eliminates site coordination delays between teams, guarantees plenum acoustic isolation, and reduces handover timelines by up to 30%.

What is included in a turnkey corporate contract with Sisco Profiles?

A turnkey contract with Sisco Profiles covers single-point execution from bare-shell handover to occupancy. Scope typically includes:

  • Civil & Partitions: Drywall partitions, masonry alterations, screeding, and raised access flooring.

  • Ceiling & Acoustics: Modular acoustic grids, baffle systems, and architectural gypsum bulkheads.

  • MEP & HVAC: Duct layout, supply/return diffusers, high- and low-voltage electrical distribution, LAN cabling, and fire suppression sprinkler drops.

  • Glazing & Joinery: Toughened glass office cabins, acoustic doors, and custom modular storage.

What are the handover milestones for a 10,000 to 25,000 sq ft office fit-out?

  • Days 1–7: Site survey, layout marking, procurement clearance, and structural slab scanning.

  • Days 8–20: High-level MEP services installation (HVAC ducting, cable trays, fire fighting lines).

  • Days 21–32: Ceiling grid framing, drywall framing, and perimeter glass track anchoring.

  • Days 33–42: Wiring pulls, duct drop connections, tile closures, and painting/finishing.

  • Days 43–50: Snagging, lux-level and acoustic testing, deep cleaning, and client handover.

What documentation is required to receive a detailed BOQ-based fit-out estimate?

To generate an itemized Bill of Quantities (BOQ), please provide:

  1. Architectural CAD floor plans (.dwg or .pdf) with reflected ceiling plans (RCP).

  2. Defined scope matrix (Civil only, Ceiling only, or Complete Turnkey Civil + MEP).

  3. Site location, floor level, and elevator/hoist access conditions.

Rough budgetary estimates based on square footage can be provided within 24 hours.

Address

Contact

Follow

  • Instagram
  • LinkedIn

©2026 Sisco Profiles. All Rights Reserved. | Address: 546/547 SWC Hub, Vasna Bhayli Road, Vadodara 391410 | Contact: 9974440304

bottom of page
Get a Free Quote